04. Permit system
 

Why draw up a permit application?

Law no. 76-663 of 19 July 1976 relative to classified installations for environmental protection (integrated into the environmental code since 2000) and its implementing decree no. 77-1133 of 21...

What does the operating authorisation application include?

The application must include the following items: Application letter The signed application letter provides the following information: Identity If the person wishing to start the installation is...

What procedure is to be followed?

As soon as the application file is received by the Prefecture, it is sent to the Inspectorate of classified installations, who checks whether it is complete and, if not, proposes to the Prefect to...

Permit procedure

Legislation: articles L512-2 and L512.15 of the environmental code articles R512-11 to R512-12, R512-14 to R512-R512-17, R512-19 to R512-22, R512-25 to R512-26, R512-28 to R512-30, R512-35, R512-45...

Scheduling control

The examination procedure takes, on average, 10 to 12 months between the date the completed and compliant application is submitted and the date the prefectural order is signed. This should be taken...

Operational requirements

Legislation: articles L229-5, L512-3 and L512.5 of the environmental code articles R512-28 to R512-30, R512-35, R512-45 to R512-46 of the environmental code. The permit order stipulates: the...

Additional orders

Legislation: articles L512-3 and L512.17 of the environmental code; articles R512-28 to R512-32, R512-35, R512-45 to R512-46 With a view to protecting the interests mentioned in article L. 511-1,...

Impact assessment

The general framework of the impact assessment is provided by article R512-6 of the environmental code. The content of the impact assessment must be proportional to the importance of the prescribed...

Risk assessment

The permit application file must include a risk assessment stating that the project can attain, within economically acceptable conditions, a risk level as low as possible, taking into account current...

Change in operation

Legislation: L512.15 of the environmental code Articles R512-33 and R512-34 of the environmental code The Prefect must be informed, prior to its implementation, of any modification made by the...

Closure of activity

Legislation: Articles L512.17, L512.19, L514.19 and L514.20 of the environmental code Articles R512-35, R512-38, R512-53, R512-74, R512-80 of the environmental code The rights associated with the...